Gary Hamilton, P.E., PMP, LEED AP, CxA, EDAC, FASHE, has been promoted to national healthcare practice leader for Property and Buildings at WSP USA. Hamilton, who joined the firm in 2017, is a senior vice president at WSP and previously led the healthcare practice for
Author: Chris Schmidt
Construction has begun on Houston Methodist’s new Cypress campus. Houston Methodist’s ninth hospital in the greater Houston, Texas area, the campus sits on 106 acres and will consist of a seven-story hospital, two medical office buildings and a central utility plant. The hospital will also incorporate technological advancements from the healthcare system’s Center for Innovation, which
A ribbon-cutting celebration and open house was recently held for the new five-story U.S. Department of Veterans Affairs Phoenix Outpatient Clinic, located in Arizona. The 280,000-square-foot clinic offers primary care, mental health treatment, radiology services, pharmacy services and more.
The expansion and renovation of the University of Virginia Medical Center located in Charlottesville, Virginia has been completed. The project, which began construction in June 2015, provides much-needed additional capacity to the facility’s emergency department as part of the completion of a
Construction has started for Texas Oncology’s new 32,000-square-foot cancer care center in Beaumont, Texas. Located on the CHRISTUS Southeast Texas St. Elizabeth hospital campus, the cancer center will provide medical oncology, radiation oncology,
Registration is now open for the American Society of Plumbing Engineers’ first MedGas Workshop, which will be held Aug. 18-21 at the organization’s headquarters in Rosemont, Illinois near Chicago, Illinois’ O’Hare Airport.
Page and EYP have closed a transaction that integrates the two design firms. The companies will expand services and geographic reach, working across offices and disciplines. The combined firm will have more than 1,300 employees across the U.S., Latin America and the Middle East.
With the 2030 Challenge pushing engineers and architects toward designs that are net-neutral for energy consumption, the challenge for those in the healthcare sector is how to achieve decarbonization and sustainability goals among competing demands and code requirements.
The P-114 medical center addition and alteration at Walter Reed National Military Medical Center in Bethesda, Maryland reached a significant milestone with the completion of structural concrete on the medical campus’s new 575,000-square-foot healthcare facility (Building C). The project team includes

