Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»Projects»Surgical Facility Provides Services to Underserved Uganda Area
    November 19, 2019

    Surgical Facility Provides Services to Underserved Uganda Area

    Share
    Facebook Twitter LinkedIn Email Copy Link

    The Kyabirwa Surgical Facility in Uganda has recently opened. A a small building with a large purpose, the project was conceived with Mount Sinai Health Systems as a replicable prototype to bring surgery to underserved areas.

    Located in a rural town on the Nile, the building takes its form from banana plants on the site that gather energy from the sun and provide shade, and is constructed of locally sourced bricks. Careful analysis of required systems and equipment resulted in the elimination of many redundant and costly systems typically found in high-tech urban hospitals. Onsite infrastructure provides solar energy, rainwater retention and direct fiber optic connection to Mount Sinai Hospital in New York, enabling real-time surgical consultation and training through telemedicine.

    The existing site does not have potable water, reliable electricity, internet or adequate sanitary facilities. Minimally invasive systems were developed to provide this essential infrastructure.

    Uninterrupted power is provided using a combination of solar panels, Li-Lead Acid Hybrid battery storage, an onsite generator and intermittent power available through the grid. Power generated from 75kWp solar panels is stored in Li-Lead Acid hybrid battery storage that can run the surgical facility for up to two days.

    Reliable internet connection is essential. Twenty miles of underground cabling brings fiberoptic service to the site.

    Well water and intermittently available town water is stored in gravity tanks onsite, filtered and sterilized on demand. Liquid sanitary waste is handled by onsite septic tank system and medical waste is incinerated onsite per the country’s health code. A greywater system collects roof rainwater and stores it in underground tanks. Greywater is used for toilet flushing and onsite vegetable garden.

    With the exception of the operating rooms, the building is not air conditioned, and relies on natural ventilation. The sloped roof provides high- and low-ventilation openings that facilitate natural air flow through building using stack effect, thus minimizing usage of electricity for ventilation/cooling.

    Gardens on the site will provide food for patients and staff.


    Project team
    Owner: Mount Sinai Health System, New York, New York
    Owner’s representative/general contractor: George Everest; Nile Precision Surveys, Jinja, Uganda
    Architect: Kliment Halsband Architects
    Structural engineer: Silman
    Mechanical engineer: Keltron Development Services

    Construction healthcare prototype International telemedicine

    Related Posts

    Construction Begins on Modular Freestanding Emergency Department in North Carolina

    October 8, 2025

    Specialty Pharmacy Opens at Middlesex Health Cancer Center

    October 6, 2025

    CON Approved for Cone Health Mebane Hospital in North Carolina

    September 29, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.