St. Louis Contractor Partners with Alliance Glazing Technologies on Medical Projects
ST. LOUIS, Mo. — IWR Building Systems was selected as the exterior enclosure contractor and design assist partner for two BJC HealthCare Washington University Medical Center campus renewal projects.
IWR Building Systems teamed with Alliance Glazing Technologies to offer a total enclosure package for both Barnes-Jewish Hospital North and St. Louis Children’s Hospital in Washington.
The new enclosure provided by IWR will include a complete, unitized approach to dry the building at an accelerated rate. A mixture of stainless steel, aluminum, concrete, stone and metal panels will be engineered and installed in the exterior of the buildings. IWR has formed multi-craft composite construction crews to provide the best possible solution for the installation of each part of the enclosure.
Posted July 2, 2015
More Articles:
- IFMA’s Facility Fusion Conference & Expo
May 5, 2024 – May 7, 2024 - ASHE Academy 2024
May 6, 2024 – May 10, 2024 - World Conference on Quality & Improvement
May 12, 2024 – May 15, 2024 - ACEC Annual Convention & Legislative Summit 2024
May 13, 2024 – May 16, 2024 - 2024 Annual Clinical & Scientific Meeting
May 17, 2024 – May 19, 2024 - CleanMed 2024
May 21, 2024 – May 23, 2024 - Hospital, Outpatient Facilities & Medical Office Buildings Summit
May 22, 2024 – May 22, 2024