Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Home»Projects»LeChase Renovating 2 Open Door Family Medical Center Buildings from Different Eras
    April 2, 2024

    LeChase Renovating 2 Open Door Family Medical Center Buildings from Different Eras

    Share
    Facebook Twitter LinkedIn Email Copy Link

    LeChase Construction Services has begun the renovation and expansion of Open Door Family Medical Center facilities in two downtown Ossining, New York buildings. The buildings, at 2 Church St. and 165 Main St., sit across the street from each other, but are from vastly different eras. LeChase will freshen the 1970s stucco Church Street structure with a modern glass façade, but will preserve the front of the 19th-century Main Street building.

    The Open Door Family Medical Center provides accessible healthcare services in Westchester, Putnam, Dutchess and Ulster counties, regardless of a patient’s ability to pay. Its network is comprised of seven family medical centers, nine school-based health centers and a mobile dental van.

    The project, designed by CannonDesign, will reconfigure the Main Street medical center, where most healthcare services are provided. The building at 2 Church St. houses administrative offices and a wellness center. When completed, each building will contain both medical care spaces and offices.

    Work at 2 Church St. includes a gut renovation of a 25,000-square-foot building. A 3,000-square-foot addition will be built, encased in glass with a staircase to Church Street that wraps around to become public seating facing the Old Croton Aqueduct walking path. A staff entrance/exit will lead to a patio for staff use facing the walking path. The building will house ambulatory care and behavioral health services and is expected to be completed by early 2025. At that time, renovations will begin on the 22,000-square-foot Main Street building, which was built as a department store and retrofitted for Open Door. Crews will bolster the wooden frame to strengthen the structure. The project is expected to be complete by mid-2026.

    Source: lechase.com/lechase-renovating-two-open-door-family-medical-center-buildings/

    LeChase MOB

    Related Posts

    Ribbon-Cutting Ceremony Held for Edwin Barbey Patient Care Pavilion at Cape Cod Hospital

    May 9, 2025

    Groundbreakings Held for Three Rehabilitation Hospitals in Florida

    May 5, 2025

    High-Tech Replacement Hospital in Georgia Tops Out

    April 30, 2025
    Industry Events
    • North Texas Summit – Future of Healthcare Facilities
      May 15, 2025 – May 15, 2025
    • 2025 ACOG Annual Clinical & Scientific Meeting
      May 16, 2025 – May 18, 2025
    • ACEC 2025 Annual Convention & Legislative Summit
      May 18, 2025 – May 21, 2025
    • Light for Life Virtual Security Symposium
      May 21, 2025 – May 21, 2025
    • Behavioral & Mental Health Workshop: Design for Health, Wellness, and Safety
      May 22, 2025 – May 22, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!