Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»Projects»McCarthy Tops Out Houston Methodist Cypress Hospital Campus
    January 17, 2023

    McCarthy Tops Out Houston Methodist Cypress Hospital Campus

    Share
    Facebook Twitter LinkedIn Email Copy Link

    McCarthy topped out Houston Methodist’s new Cypress Hospital campus located in the greater Houston, Texas area. The campus sits on 105 acres and consists of a seven-story hospital, two medical office buildings and a central utility plant, with a mixture of built out space, as well as a shell for future growth. McCarthy broke ground on the hospital in February 2022, and construction is scheduled to achieve substantial completion by the end of 2024.

    The company’s scope includes demolition of 11 existing buildings, totaling 600,000 square feet before constructing the new hospital with capacity for 276 licensed beds. The campus consists of a 569,100-square-foot, seven-story hospital building centered around a seven-story atrium. It also includes two medical office buildings that are six stories each. The first, totaling over 162,900 square feet, contains a cancer center with linear accelerator, a breast center, infusion and pharmacy areas and a bridge connector to the new hospital tower. The second, totaling 160,200 square feet, includes an orthopedics and sports medicine center and clinics. McCarthy is also renovating an existing 29,000-square-foot central utility plant onsite.

    All structures, including the hospital and both medical office buildings, are pan-deck concrete structures, with envelopes consisting of masonry and glazing similar to Houston Methodist’s other community hospital campuses.

    McCarthy serves as the project construction manager at risk with Page as the project architect. Walter P. Moore is the project structural and civil engineer, Smith Seckman Reid, Inc. handles mechanical, electrical, and plumbing, OJB is the landscape architect, and Vizient oversees medical equipment planning.

    McCarthy Page

    Related Posts

    Health First Unveils $230M Expansion Plans for Palm Bay Hospital in Florida

    June 2, 2025

    Robins & Morton, AdventHealth Celebrate Ribbon Cutting of $26 Million AdventHealth Meadow Pointe ER

    May 30, 2025

    Virtua Health Celebrates 75th Hospital Anniversary, Unveils $500M Renovation, Expansion Project in New Jersey

    May 29, 2025
    Industry Events
    • HealthSpaces 2025
      Jun 8, 2025 – Jun 10, 2025
    • NeoCon 2025
      Jun 9, 2025 – Jun 11, 2025
    • Guidelines for Laboratory Design – Health and Safety Considerations
      Jun 9, 2025 – Jun 13, 2025
    • 2025 FGIA Virtual Summer Summit
      Jun 17, 2025 – Jun 18, 2025
    • Building Decarbonization – Key Test and Balance Issues and Solutions for Occupancy, Wellness, and Sustainability
      Jun 18, 2025 – Jun 18, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!