Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»News»Secretary Shinseki Breaks Ground for Replacement Medical Center in New Orleans
    June 25, 2010

    Secretary Shinseki Breaks Ground for Replacement Medical Center in New Orleans

    Share
    Facebook Twitter LinkedIn Email Copy Link

    Project to Bring 2,000 Construction Jobs

    NEW ORLEANS – Fulfilling President Obama’s commitment to rebuild New Orleans, Secretary of Veterans Affairs Eric K. Shinseki joined state and local officials for a ground-breaking ceremony for a new 1.5 million-square-foot medical center for the Department of Veterans Affairs (VA).

    “This is a historic day for all of Louisiana,” Secretary Shinseki said.  “With this ground breaking, we begin rebuilding a new legacy, a new chapter in the history of this proud city.”


    VA’s new full-service medical center campus in New Orleans is at a site bounded by Canal Street, S. Galvez Street, Tulane Avenue and S. Rocheblave Street.

    “This facility will become a cornerstone in New Orleans’ medical research community, which will ensure the best care is available for our Louisiana Veterans,” Shinseki added.  “VA is proud to bring this state-of-the-art facility to New Orleans.”

    When opened in 2013, the facility will have 120 inpatient beds in addition to 60 transitional care beds that provide rehabilitation, hospice and palliative care and mental illness research.  The hospital will accommodate a half-million outpatient visits annually.

    The new medical center will also be ideally suited to serve Veterans and the citizens of southern Louisiana in the case of an emergency.  Once construction is complete, the new medical center will be able to operate independently for seven days without resupply.  All mission-critical services will be 20 feet above ground level, and the facility will have a heliport and boat dock for evacuations.

    As part of VA’s preservation efforts, the Pan-American Life Insurance Company Building will be rehabilitated and integrated into the design of the new medical center.  VA will also conduct a structural appraisal of the Dixie Brewery.  VA is working with the city and state to ensure all other historically significant buildings are either preserved and moved from the site or that architecturally significant pieces will be salvaged before any necessary demolition.

    Related Posts

    Research Team to Explore How Building Façades Can Function as Air Purifiers

    October 29, 2025

    Novant Health Unveils Plans to Expand Care in Brunswick County, North Carolina

    October 28, 2025

    SSOE Welcomes SHYFT Design, Expands Architectural Capabilities

    October 17, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.