Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»News»Plans Underway for All-Electric Kitchen at UCLA Health’s New Neuropsychiatric Hospital
    May 17, 2024

    Plans Underway for All-Electric Kitchen at UCLA Health’s New Neuropsychiatric Hospital

    Share
    Facebook Twitter LinkedIn Email Copy Link

    As construction continues for UCLA Health’s new neuropsychiatric hospital in the Los Angeles, California’s Mid-Wilshire area, plans are underway for what is believed to be California’s first all-electric hospital kitchen. The transition from gas to electric cooking reflects a commitment to reducing carbon emissions and embracing sustainable practices.

    UCLA Health is working closely with vendors, industry experts and Southern California Edison. The utility is offering a test kitchen where dining services staff will train on the types of electric equipment to be installed in the new hospital’s kitchen. Cooking times and temperatures may differ on electric versus other equipment.

    The kitchen is expected to be completed six months ahead of the hospital opening so staff can test menu items and develop processes that ensure quality and consistency.

    “We’re not just transitioning from gas to electric grilling; we’re modeling the change necessary to transition into a new way of life,” says Genesis Robinson, administrative director of food and nutrition services at UCLA Health.

    Read the full story here.

    Neuropsychiatric Hospital UCLA Health

    Related Posts

    Shriners’ Statue Unveiled at MUSC Shawn Jenkins Children’s Hospital

    June 6, 2025

    Robins & Morton, AdventHealth Celebrate Ribbon Cutting of $26 Million AdventHealth Meadow Pointe ER

    May 30, 2025

    Design Complete for Roper St. Francis Replacement Project in South Carolina

    May 29, 2025
    Industry Events
    • HealthSpaces 2025
      Jun 8, 2025 – Jun 10, 2025
    • NeoCon 2025
      Jun 9, 2025 – Jun 11, 2025
    • Guidelines for Laboratory Design – Health and Safety Considerations
      Jun 9, 2025 – Jun 13, 2025
    • 2025 FGIA Virtual Summer Summit
      Jun 17, 2025 – Jun 18, 2025
    • Building Decarbonization – Key Test and Balance Issues and Solutions for Occupancy, Wellness, and Sustainability
      Jun 18, 2025 – Jun 18, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!