Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»News»Mayo West Tower Project Wins Cold-Formed Steel Engineers Institute Award
    May 25, 2023

    Mayo West Tower Project Wins Cold-Formed Steel Engineers Institute Award

    Share
    Facebook Twitter LinkedIn Email Copy Link

    Mayo West Tower, an expansion project of Mayo Clinic in Phoenix Arizona, has won an award from the Cold-Formed Steel Engineers Institute.

    Honored with a second-place award in the category of Municipal/Services, Mayo West Tower is a seven-story structure (concourse plus six floors above grade) with approximately 140,000 square feet of prefinished exterior cold-formed steel non-load bearing wall panels.

    Digital Building Components is the cold-formed steel fabricator and Pangolin Structural is the CFS specialty engineer for the project. DBC fabricated around 1,500 wall panels prefinished with windows preinstalled. The sizes of the panels are around 24 feet in length, 15 feet in height and 24 inches thick.

    The size of the panels posed a unique challenge, spurring innovative solutions. Ultimately, the team decided to use 12-inch studs as the first layer wall and then place 6-inch J girts horizontally, which act as bracing for these long panels during shipping and hoisting. The team realized there was an issue with transitioning from a 24-inch-thick wall to a 6-inch wall for hoisting. The architect (HKS) did not want a panel joint separating them, so Digital Building Components and Pangolin Structural devised the solution of fabricating them as separate panels and connecting with welds to hold the panel in place for lifting as one single piece.

    Photo courtesy of Digital Building Components

    Awards CFS Digital Building Components HKS Mayo West

    Related Posts

    Robins & Morton, AdventHealth Celebrate Ribbon Cutting of $26 Million AdventHealth Meadow Pointe ER

    May 30, 2025

    Design Complete for Roper St. Francis Replacement Project in South Carolina

    May 29, 2025

    Geisinger Breaks Ground on Hospital $880M Expansion, Modernization Project

    May 23, 2025
    Industry Events
    • AIA Conference on Architecture 2025
      Jun 4, 2025 – Jun 7, 2025
    • HealthSpaces 2025
      Jun 8, 2025 – Jun 10, 2025
    • NeoCon 2025
      Jun 9, 2025 – Jun 11, 2025
    • Guidelines for Laboratory Design – Health and Safety Considerations
      Jun 9, 2025 – Jun 13, 2025
    • 2025 FGIA Virtual Summer Summit
      Jun 17, 2025 – Jun 18, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!