Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Home»eNewsletter»Color + Light Drive Design at Driscoll Children’s North Pavilion
    April 12, 2022

    Color + Light Drive Design at Driscoll Children’s North Pavilion

    Share
    Facebook Twitter LinkedIn Email Copy Link

    Located in Corpus Christi, Texas, Driscoll Children’s Hospital’s largest campus project since 1984, the new North Pavilion is a five-story, 180,000-square-foot expansion sited on its campus to create connectivity from the parking garage to all major buildings and services. As an outcome of a comprehensive 2015 master planning effort, the primary inpatient service within the pavilion is a family focused, 22-bed pediatric intensive care unit, featuring a satellite pharmacy and family amenities, such as parents’ shower/changing areas. Adjacent to the PICU is a three-room procedure suite with accompanying patient preparation and recovery bays.

    At the project outset, color was utilized as an expression of design. Base neutrals were identified within the existing facility, while a timeless, multi-hued solution was determined to evoke joy, to imbue a sense of safety and to establish a sense of belonging. A spectral color ribbon begins at the connection corridor of the pavilion and the existing building, and winds through a light-filled public area overlooking a newly landscaped sculpture garden.

    Lighter, natural blues to a more vibrant purple-blue, and then deep magenta elements through the flooring, wall treatments and furniture create a flow through the lobby. Natural wood at entry portals brings a warmth to the space, while serving as visual indicators to other spaces such as lab waiting, registration and children’s play areas.

    A three-story light well off the lobby serves to flood the deep floorplate with daylight, while offering an opportunity for donor and value recognition. Staff spaces were also given access to daylighting as much as possible to provide views, and to separate corridor systems for free movement of hospital supplies and staff. The project team included Fulton-Coastcon and Page.

    Children's Hospital Construction daylighting

    Related Posts

    Virtua Health Celebrates 75th Hospital Anniversary, Unveils $500M Renovation, Expansion Project in New Jersey

    May 29, 2025

    Design Complete for Roper St. Francis Replacement Project in South Carolina

    May 29, 2025

    Geisinger Breaks Ground on Hospital $880M Expansion, Modernization Project

    May 23, 2025
    Industry Events
    • IAQA 2025 Annual Meeting & Expo
      Jun 1, 2025 – Jun 4, 2025
    • ACE Summit Session on Alignment in the Design Process
      Jun 2, 2025 – Jun 2, 2025
    • Energy Management 101 – The Building Blocks of an Effective Energy Management Program
      Jun 3, 2025 – Jun 3, 2025
    • Webinar: Design and Workflow Essentials for Instrument Processing Areas
      Jun 5, 2025 – Jun 5, 2025
    • Houston Summit – Future of Healthcare Facilities
      Jun 5, 2025 – Jun 5, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!