Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»eNewsletter»Tower Construction Begins at Dignity Health Chandler Regional Medical Center
    September 12, 2019

    Tower Construction Begins at Dignity Health Chandler Regional Medical Center

    Share
    Facebook Twitter LinkedIn Email Copy Link

    Ground was recently broken on construction of a new 220,000-square-foot medical tower at Dignity Health Chandler Regional Medical Center located in Arizona. The project team includes McCarthy Building Companies, Inc.; Devenney Group Architects; WSP; Stantec; RVi; Buehler Engineering; Cannon & Wendt Electrical Co.; TDIndustries; The Berg Group and Schuff Steel Management Company.

    Slated to open in spring 2021, the tower addition and expansion project will add 96 patient beds and is expected to also add approximately 200 jobs. Chandler Regional’s fourth patient tower, Tower D, will bring the medical facility’s total bed count to 429. The hospital originally opened in 1961 with just 42 beds.

    The new medical tower will be built south of Chandler Regional’s main entrance on what is now a parking lot. In addition to the 96 patient beds, the five-story tower will also have space on the first and fifth floors for additional growth in the future. The tower will increase surgical capacity, add cardiac-rehabilitation services and will also feature:

    • First floor: new main hospital entrance and lobby, patient admitting, cardiac rehabilitation, ambulatory therapy unit, gift shop and chapel
    • Second floor: surgery registration area, pre-operation and post-anesthesia care units and 24 thoracic patient rooms
    • Third floor: 36 intensive care unit patient rooms
    • Fourth floor: 36 additional standard patient rooms
    • Fifth floor: shell space for future beds
    • Basement: new pharmacy, materials management department and a new loading dock

    Additional renovations include 55,000 square feet of the hospital’s existing Tower C, which opened in 2014. The renovations will allow for eight new surgical suites and the expansion of outpatient services and operational departments, with scheduled completion in 2022 as part of phase two of the project.

    Renderings courtesy of McCarthy.

    Related Posts

    Health First Unveils $230M Expansion Plans for Palm Bay Hospital in Florida

    June 2, 2025

    Robins & Morton, AdventHealth Celebrate Ribbon Cutting of $26 Million AdventHealth Meadow Pointe ER

    May 30, 2025

    Virtua Health Celebrates 75th Hospital Anniversary, Unveils $500M Renovation, Expansion Project in New Jersey

    May 29, 2025
    Industry Events
    • AIA Conference on Architecture 2025
      Jun 4, 2025 – Jun 7, 2025
    • HealthSpaces 2025
      Jun 8, 2025 – Jun 10, 2025
    • NeoCon 2025
      Jun 9, 2025 – Jun 11, 2025
    • Guidelines for Laboratory Design – Health and Safety Considerations
      Jun 9, 2025 – Jun 13, 2025
    • 2025 FGIA Virtual Summer Summit
      Jun 17, 2025 – Jun 18, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!