Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Industry Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»Featured»Swinerton Reaches Construction Milestone for DOCS Surgical Hospital
    February 4, 2026

    Swinerton Reaches Construction Milestone for DOCS Surgical Hospital

    Share
    Facebook Twitter LinkedIn Email Copy Link

    Swinerton has completed the closing in phase of construction for the new six story DOCS Surgical Hospital in Los Angeles, California. Designed by Cuningham Group, the project is expected to be complete in late 2026. The hospital will feature advanced operating theaters, robotic surgical technology and specialized imaging centers to improve efficiency and outcomes.

    With the building now enclosed, the project is transitioning into its next major phase of construction. Upcoming work includes the start of interior metal stud framing, placement of concrete for the slab-on-grade and continued installation of site utilities and underground tanks. Additionally, steel erection of the porte-cochere will soon be underway, further shaping the facility’s arrival experience and advancing the project toward full build-out.

    The project site presents unique logistical challenges due to its restricted footprint and location in a densely populated residential neighborhood. With property lines on all four sides and no perimeter space for a tower crane, Swinerton implemented innovative solutions by positioning the crane and man hoist at the center of the building footprint. Safety measures, including K-rails, covered walkways and fencing were installed along the perimeter, and an emergency egress path was integrated to ensure compliance and safety in the event of a disaster.

    Open communication has been maintained with neighboring property management to minimize disruptions. Deteriorated asphalt in the adjacent alleyway will be replaced as part of a good-faith agreement with the city. The existing single-story hospital adjacent to the new facility was demolished in early 2025 to create a surface parking lot, following compliance with AB 2190 seismic regulations.

    Swinerton Builders

    Related Posts

    Tariffs Drive Construction Materials Prices Up 2.8% in 2025

    February 3, 2026

    Robins & Morton, AdventHealth Break Ground on AdventHealth Auburndale ER

    February 2, 2026

    Lurie Children’s Begins Planning for Community-Based Pediatric Hospital in Downers Grove Area

    January 28, 2026

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.