Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Industry Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»News»Prefab Speeds Completion, Installation of 2 Identical Freestanding Emergency Departments
    November 4, 2024

    Prefab Speeds Completion, Installation of 2 Identical Freestanding Emergency Departments

    Share
    Facebook Twitter LinkedIn Email Copy Link

    Ribbon cuttings celebrated the openings of two nearly identical freestanding emergency departments — one in Florida and one in Texas.

    Manatee Memorial Hospital’s new 10,884-square-foot Manatee ER at Palma Sola, located in Bradenton, Florida, includes six exam rooms, three rapid medical spaces, a full-service laboratory, along with X-ray and ultrasound areas. South Texas Health System ER Pharr is a new 10,884-square-foot facility, located in Pharr, Texas. It will provide around-the-clock critical care for adult and pediatric patients, as well as diagnostic and laboratory services with limited wait times.

    Both facilities were built using preassembled modular system that required intensive coordination with sitework and utilities. The construction teams were able to fully dry-in the buildings only 12 days after the modules arrived onsite. The overall schedule was six weeks faster than traditional construction.

    Robins & Morton served as the general contractor for the projects. Giattina Aycock Architecture Studio was the architect.

    Giattina Aycock Architecture Studio Robins & Morton

    Related Posts

    Joint Venture to Build Freestanding ED, Wellness Center in Fort Lauderdale, Florida

    February 27, 2026

    New Research Shows Architects Eager for Greater Influence in Building Product Innovation

    February 26, 2026

    $50M Addition, Renovation Project Begins at FirstHealth Moore Regional Hospital – Hoke

    February 25, 2026

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.