Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»eNewsletter»Banner Gateway Medical Center Tower Expansion Doubles Size of Medical Campus
    April 17, 2023

    Banner Gateway Medical Center Tower Expansion Doubles Size of Medical Campus

    Share
    Facebook Twitter LinkedIn Email Copy Link

    McCarthy Building Companies recently completed the $243-million, five-story Banner Gateway Medical Center tower expansion project, located in Gilbert, Arizona. The expansion doubles the size of the medical center campus and is expected to add more than 600 new jobs to the campus.

    Photo credit: CDP Commercial

    The 351,000-square-foot addition includes an expanded Women and Infant Services Unit with NICU, added space for inpatient cancer care by Banner MD Anderson Cancer Center (located on the same campus) and more space for surgical, emergency, endoscopy and imaging services, including four new operating rooms, a new MRI, as well as angiogram and endoscopy suites. In addition, the tower expansion increases inpatient beds from 177 to 286 with additional shell space to accommodate future growth, and the relocation of the helipad to the new tower’s rooftop.

    The project was managed using a modified Integrated Project Delivery with the owner, design team, general contractor and trade partners all co-locating in a virtual “big room,” allowing for the project’s design and construction strategies to be developed and enhanced through a robust system of collaboration, solution innovations and coordination strategies being brought to the project to ensure operational excellence and end-user efficiency.

    The architect on the project was SmithGroup with civil engineering led by Dibble Engineering and structural engineering led by PK Associates. Field Verified served as an exterior skin consultant.

    Construction on the tower expansion began in February 2021 and some campus renovation work will continue into 2024.

    Dibble Engineering Integrated Project Delivery McCarthy Building Companies PK Associates SmithGroup tower expansion project

    Related Posts

    Health First Unveils $230M Expansion Plans for Palm Bay Hospital in Florida

    June 2, 2025

    Robins & Morton, AdventHealth Celebrate Ribbon Cutting of $26 Million AdventHealth Meadow Pointe ER

    May 30, 2025

    Virtua Health Celebrates 75th Hospital Anniversary, Unveils $500M Renovation, Expansion Project in New Jersey

    May 29, 2025
    Industry Events
    • HealthSpaces 2025
      Jun 8, 2025 – Jun 10, 2025
    • NeoCon 2025
      Jun 9, 2025 – Jun 11, 2025
    • Guidelines for Laboratory Design – Health and Safety Considerations
      Jun 9, 2025 – Jun 13, 2025
    • 2025 FGIA Virtual Summer Summit
      Jun 17, 2025 – Jun 18, 2025
    • Building Decarbonization – Key Test and Balance Issues and Solutions for Occupancy, Wellness, and Sustainability
      Jun 18, 2025 – Jun 18, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!