Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Home»eNewsletter»UC Health Clifton Campus Revitalization Underway on $250M Transformation
    April 14, 2021

    UC Health Clifton Campus Revitalization Underway on $250M Transformation

    Share
    Facebook Twitter LinkedIn Email Copy Link

    UC Health, Greater Cincinnati, Ohio’s academic health system, is taking the next step in its Clifton Campus Revitalization, including unveiling renderings of its new facilities and beginning demolition to make way for a $251-million investment across the 14-acre campus. It is the largest construction project in the health system’s history.

    The project includes a significant expansion and renovation of the 30-year-old emergency department at UC Medical Center and the construction of a four-story building to add operating room capacity at the hospital. In addition, two new parking structures for patients, visitors and employees are being planned that will add 1,300 parking spaces at the Clifton campus.

    The surgical building is expected to open in early 2023, followed by the new ED building in summer 2023.

    CannonDesign is overseeing project design, and Messer Construction Co. is managing construction. HPlex Solutions serves as the owner’s representative to manage the project.

    Additionally, work is underway on a $15-million renovation of the front entrance and main lobby at UC Medical Center, which will improve accessibility of UC Health services and destinations. The front entrance includes an improved drive, sidewalks, landscaping, lighting, canopy, wayfinding and patient drop-off; the main lobby includes improved services, central registration, new artwork and contemporary materials to provide patients and visitors with a calming arrival experience.

    The UC Medical Center front entrance and main lobby renovation team includes Danis Construction, GBBN Architects, THP and Heapy Engineering.

    Both projects were announced in 2019 and projected to begin in 2020. While the ED and surgery building planning and design progressed throughout 2020, the front entrance and main lobby construction was temporarily suspended due to the onset of the COVID-19 pandemic.

    Physical changes to the Clifton Campus began in December 2020, and the projects will occur in a cascading manner over the next five years. Patient care will not be interrupted.

    UC Health’s Clifton Campus spans 14 acres in the heart of Cincinnati’s Uptown district, and it includes 17 buildings that total 1.7 million gross square feet. All construction will occur within UC Health’s existing footprint, as the health system innovates to provide world-class care in a healing environment.

    The Clifton Campus Revitalization includes:

    • Expand the UC Medical Center ED onto an adjacent vacant lot. The 46,000-square-foot addition will improve capacity and patient flow, including reconfigured access for patient arrivals via ambulance and private vehicles. The UC Medical Center B Pavilion will be demolished to accommodate the new ED and clinical units and administrative offices within this pavilion have been relocated.
    • Renovate the existing 35,000-square-foot ED to provide additional emergency response ability and “surge” capacity for emergency and crisis situations. In FY20, UC Health had 114,402 ED and trauma visits and received more than 8,000 patient transfers from other health systems.
    • Build three additional floors above the new ED to accommodate an observation unit, a flexible ICU unit, a shelled floor for future inpatient care use and a top mechanical floor that will enable a future vertical build of the tower.
    • Construct a four-story infill building in the “back porch” area of UC Medical Center near Mont Reid Pavilion to accommodate eight additional operating rooms and other clinical support space. This necessitated the demolition of the radiology administrative building and the old operating pavilion. Outpatient clinics and administrative offices were relocated, and demolition began in December 2020 and was completed earlier this month. The hospital’s historic surgical amphitheater, restored in 2005, was preserved.
    • Construct two new parking structures on the campus of 3200 Burnet to accommodate the increased patient care in Ridgeway Tower and to provide additional parking for employees. This will include the demolition of Greenwood Hall, which has been vacant for many years.
    Construction revitalization

    Related Posts

    Healthcare Proposal Activity Slips, but Remains Resilient: PSMJ Survey

    May 14, 2025

    Healthcare Projects Recognized for Construction Excellence by Associated Builders and Contractors

    May 14, 2025

    Outpatient Revolution: Double-Digit Growth on Horizon, Says JLL

    May 14, 2025
    Industry Events
    • 2025 ACOG Annual Clinical & Scientific Meeting
      May 16, 2025 – May 18, 2025
    • ACEC 2025 Annual Convention & Legislative Summit
      May 18, 2025 – May 21, 2025
    • Light for Life Virtual Security Symposium
      May 21, 2025 – May 21, 2025
    • Behavioral & Mental Health Workshop: Design for Health, Wellness, and Safety
      May 22, 2025 – May 22, 2025
    • Energy Management 101 – The Building Blocks of an Effective Energy Management Program
      Jun 3, 2025 – Jun 3, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!