Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Home»eNewsletter»ASHE Celebrates 2020 Winners of Vista Awards
    May 12, 2020

    ASHE Celebrates 2020 Winners of Vista Awards

    Share
    Facebook Twitter LinkedIn Email Copy Link

    Hospitals in Nevada, Washington and Connecticut are the recipients of this year’s Vista Awards, which celebrate teamwork and excellence in healthcare facility projects. The winners are Henderson Hospital in Henderson, Nevada; Kadlec Regional Medical Center in Richland, Washington and Yale New Haven Hospital in New Haven, Connecticut. These projects won in the categories of best new construction, renovation and infrastructure, respectively.

    The Vista Awards are presented by the American Society for Health Care Engineering. These specific awards recognize significant collaboration in creating optimal healthcare environments. Each winning team has exemplified outstanding teamwork in all stages of their respective healthcare projects, from preplanning to the final reveal.

    New Construction
    Henderson Hospital
    Project Team: HMC Architects, Turner and SR Construction

    Located on the outskirts of Las Vegas, Henderson Hospital’s 250,000-square-foot, 166-bed facility was one of the fastest hospitals built in the western United States. The hospital opened in October 2016 and created a focal point for the Union Village 155-acre development. It improves the patient and family experience, and offers care to future residents of the village, along with residents of Henderson. Union Village includes skilled nursing facilities, medical offices, retail, residential living, entertainment, hotel, senior village and cultural center. Through the use of collaboration, innovation and a commitment to improve efficiency and eliminate waste, the project team built a high-performing facility in record time. The team recognized that implementing an IPD Lean approach was the key to the success of the project. In addition, the effort, commitment and accountability of each team member was significant.

    Renovation
    Kadlec Regional Medical Center River Pavilion Patient Tower
    Project Team: Davis Partnership Architects, Mazzetti, Stantec and Bouten Construction

    In November 2016, Kadlec Regional Medical Center completed a four-story addition to the River Pavilion Patient Tower in order to increase capacity as the community grew. Due to campus constraints, the only option was to build vertically upon the existing campus. The new 90,000-square-foot, 94-bed patient tower added to the pre-existing six-story inpatient tower that was fully occupied. Two floors provide 54 acute care patient rooms, while the additional two floors provide 40 intensive care patient rooms. All rooms have expansive views of the Columbia River Basin. Family support is a significant part of patient care at Kadlec, and each patient room is private with its own toilet, shower and space for family members to gather, rest and consult with the healthcare team. Auxiliary features of the tower include a rooftop helipad for emergency transportation, and an outdoor roof terrace with seating options, shade structures and water features.

    Infrastructure
    Yale New Haven Hospital, St. Raphael Campus
    Project Team: BR+A and Shepley Bulfinch, Turner Construction

    Yale New Haven Hospital acquired the Hospital of Saint Raphael in September 2012, forming a single, dual-campus hospital in New Haven. Many of Saint Raphael’s existing systems were found unreliable with no room for expansion, such as the major equipment in the central utility plant exceeding its useful life. Due to high-patient census, the project team instituted a multi-phased, accelerated construction schedule to minimize downtime. This included implementation of chiller plant upgrades completed during off-season months, utilizing a portable roll-up 2 mW generator during upgrades to maintain emergency power availability, and cross connection of air handling units to maintain code-required air changes to all areas of the hospital during construction. The design process was collaborative with consistent communication among team members and maintained continuity. Long-term goals were carried through without disruption.

    For more information about the Vista Awards and the winners, visit ashe.org/awards/vista.

    Architecture ASHE IPD Lean Sustainability Vista Awards

    Related Posts

    Array Architects Deepens Healthcare Expertise with Acquisition of IHR Architecture

    May 19, 2025

    ABC: Construction Materials Prices Tame in April Despite Rising Iron, Steel Costs

    May 16, 2025

    Robins & Morton Releases 2025 State of Healthcare Construction Report

    May 14, 2025
    Industry Events
    • Behavioral & Mental Health Workshop: Design for Health, Wellness, and Safety
      May 22, 2025 – May 22, 2025
    • IAQA 2025 Annual Meeting & Expo
      Jun 1, 2025 – Jun 4, 2025
    • ACE Summit Session on Alignment in the Design Process
      Jun 2, 2025 – Jun 2, 2025
    • Energy Management 101 – The Building Blocks of an Effective Energy Management Program
      Jun 3, 2025 – Jun 3, 2025
    • Houston Summit – Future of Healthcare Facilities
      Jun 5, 2025 – Jun 5, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!