Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»eNewsletter»450,000-SF Methodist University Hospital Vertical Expansion Opens
    June 7, 2019

    450,000-SF Methodist University Hospital Vertical Expansion Opens

    Share
    Facebook Twitter LinkedIn Email Copy Link

    A $275-million, 450,000-square-foot patient tower at Methodist University Hospital, located in Memphis, Tennessee is complete. The nine-story patient tower was constructed on top of the already existing emergency department and is part of the hospital’s campus expansion project, which also includes a 700-space parking plaza. Called Shorb Tower, it is named in honor of recently retired Methodist Le Bonheur Healthcare President and CEO Gary Shorb.

    The hospital will consolidate its transplant services into a two-floor inpatient/outpatient comprehensive transplant institute in the new tower. In addition to transplant, the new tower will include cardiology, blood and marrow transplant and oncology services. The expansion allows for a 36% increase in ICU capacity and a 20% increase in the hospital’s operating room capacity. The next phase of the project includes 94,000 square feet of renovations to existing patient and operating rooms.

    Laser scanning technology was used to scan each of the 70 patient bathrooms to ensure the floors are perfectly sloped so that no water will pool. A newer technology, it takes the scanning process down from six to 10 minutes per room scan to just 24 seconds, ensuring delivery of a quality product in minimum time.

    To modernize the look of the campus, most of which is made of red brick, the building has a dynamic glass system on the exterior of the tower that gives a new identity to the hospital’s main entrance.

    The project team worked closely with members of the community throughout the project, achieving 28% participation from minority- and women-owned businesses. Subcontractors working on the project received free OSHA 30-hour training classes, during which attendees learned about health and safety awareness in the industry.

    The project team included Turner Construction, Self+Tucker Architects, archimania, HKS, Inc., Bernhard TME and Allen & Hoshall.

    Photos courtesy of HKS, Inc.

    Construction Expansion laser scanning OSHA vertical build

    Related Posts

    Health First Unveils $230M Expansion Plans for Palm Bay Hospital in Florida

    June 2, 2025

    Robins & Morton, AdventHealth Celebrate Ribbon Cutting of $26 Million AdventHealth Meadow Pointe ER

    May 30, 2025

    Virtua Health Celebrates 75th Hospital Anniversary, Unveils $500M Renovation, Expansion Project in New Jersey

    May 29, 2025
    Industry Events
    • IAQA 2025 Annual Meeting & Expo
      Jun 1, 2025 – Jun 4, 2025
    • AIA Conference on Architecture 2025
      Jun 4, 2025 – Jun 7, 2025
    • Webinar: Design and Workflow Essentials for Instrument Processing Areas
      Jun 5, 2025 – Jun 5, 2025
    • Houston Summit – Future of Healthcare Facilities
      Jun 5, 2025 – Jun 5, 2025
    • HealthSpaces 2025
      Jun 8, 2025 – Jun 10, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!