Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»eNewsletter»New 1M-Square-Foot California Hospital Themed for Natural Elements, Seismic-Event Ready
    March 13, 2019

    New 1M-Square-Foot California Hospital Themed for Natural Elements, Seismic-Event Ready

    Share
    Facebook Twitter LinkedIn Email Copy Link

    SmithGroup recently celebrated the opening of the new Sutter Health California Pacific Medical Center Van Ness Campus Hospital in downtown San Francisco, California, with the 1,015,000-square-foot, $2.1-billion hospital welcoming its first patients.

    Envisioned as a new hub for Sutter CPMC services citywide and based on a strategic master plan developed by SmithGroup, the flagship hospital brings adult acute care and women’s and children’s care into one facility. Eleven patient floors house 274 beds in an environment designed to provide patients an empowering, calming and healing experience.

    SmithGroup led the planning and design of the new hospital, delivered through an Integrated Project Delivery process in collaboration with contractor HerreroBOLDT and 16 other risk-reward partners. Among the largest IPD hospital projects completed in the United States, the cohesive design and construction approach resulted in numerous successes, including delivering the project on time and $150 million under the original project budget.

    Sitting atop the peak of Cathedral Hill at the busy intersection of Van Ness Avenue and Geary Boulevard, the new 12-story building enhances the urban fabric with a contemporary glass, metal and stone tower meant to reflect the high-rise commercial and residential buildings of the city’s nearby financial district.

    At street-level, shadow boxes with colored-LED lighting and varied glass, green walls and micro-retail storefronts soften the building. Widened sidewalks, abundant bench seating and planters that both treat stormwater and buffer the sidewalk from the street create a safer, more enjoyable experience for pedestrians.

    Inside the hospital, each floor is themed to a natural element—earth, flora, water, light and air—with sophisticated finishes, colors and the use of super graphics to reinforce the concept of that floor and help to orient visitors. Lighting design throughout the hospital enhances healing and helps to clarify wayfinding in the large facility.

    In response to California’s 2030 deadline that hospitals must be capable of remaining operational after an earthquake, the building uses two novel approaches to strengthen the structure against seismic vibration. One-hundred-twenty viscous wall dampers are placed around the perimeter of the building’s floorplates to absorb vibration, the first time this technology has been used in a hospital in North America. Four-sided structural silicone sealant on the glass curtainwall system provides a higher-performance façade in a seismic event.

    The new hospital is designed to use 14 percent less energy than an average hospital of its size and is targeting LEED Silver certification from the USGBC. One hundred percent of patient rooms receive direct natural daylight, and energy-efficient LED lighting is used where artificial light is needed. A 100 percent filtered outside air system enhances the interior air quality while being a lower-energy ventilation system. Five vegetated roofs totaling 25,000 square feet are planted with native plants that filter rainwater for irrigation, saving 180,000 gallons of drinkable water annually.

    SmithGroup provided integrated design services including strategic master planning, architectural design, medical planning and programming, interior design and lighting design. Other members of the IPD team are HerreroBOLDT, a joint venture of Herrero Builders and The Boldt Company, as construction manager and general contractor.

    Other design IPDT team members include Ted Jacob Engineering Group as mechanical engineer, Degenkolb Engineers  as structural engineer, CallisonRTKL Associates as medical equipment consultant, Silverman and Light as electrical engineer and Vantage Technology Consulting as technology consultant.

    Photos courtesy of Kyle Jeffers.

    Construction IPD LEED Silver Sustainability

    Related Posts

    Robins & Morton, AdventHealth Celebrate Ribbon Cutting of $26 Million AdventHealth Meadow Pointe ER

    May 30, 2025

    Virtua Health Celebrates 75th Hospital Anniversary, Unveils $500M Renovation, Expansion Project in New Jersey

    May 29, 2025

    Design Complete for Roper St. Francis Replacement Project in South Carolina

    May 29, 2025
    Industry Events
    • IAQA 2025 Annual Meeting & Expo
      Jun 1, 2025 – Jun 4, 2025
    • ACE Summit Session on Alignment in the Design Process
      Jun 2, 2025 – Jun 2, 2025
    • Energy Management 101 – The Building Blocks of an Effective Energy Management Program
      Jun 3, 2025 – Jun 3, 2025
    • Webinar: Design and Workflow Essentials for Instrument Processing Areas
      Jun 5, 2025 – Jun 5, 2025
    • Houston Summit – Future of Healthcare Facilities
      Jun 5, 2025 – Jun 5, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!