Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»Support Facilities»Hoar Construction Starts CEP Piping Expansion at Children’s of Alabama
    July 5, 2018

    Hoar Construction Starts CEP Piping Expansion at Children’s of Alabama

    Share
    Facebook Twitter LinkedIn Email Copy Link

    BIRMINGHAM, Ala. – Hoar Construction recently started a piping expansion project that ties the Lowder and McWane buildings into the Central Energy Plant on the Children’s of Alabama campus. The CEP was built to anticipate a larger load than the Benjamin Russell expansion facility and to eventually support all existing facilities on the Children’s campus.

    The team will take the hot and chilled water piping from the Benjamin Russell Hospital 6th Avenue tunnel into the McWane and Lowder buildings. The work will require coordinating with multiple trade partners and managing dozens of shutdowns. Much of the work will occur at night and on weekends to minimize the effects to hospital patients and employees.

    The CEP, originally designed to handle the load of the McWane and Lowder buildings, produces hot and chilled water which is not being used. When the project is complete, the hospital will be able to discontinue using the existing boilers and chillers used to create hot/chilled water for the McWane and Lowder buildings. Work will coincide with weather seasons to minimize the amount of temporary heating and cooling required.

    The project will include demolition of an existing elevator shaft to create a new pipe chase and make room for the installation of a smaller elevator. Along with the piping expansion, several equipment items will be replaced including multiple air handlers, heat exchangers and air handler coils. Also included are two new dual-fuel boilers at the CEP and supporting infrastructure, including a large two-story boiler flue. Work is scheduled to be complete in December 2019.

    Hoar Construction completed the Benjamin Russell Hospital for Children and new CEP in 2012, delivering the projects on time and under budget. Since then Hoar has completed more than 1100 work orders on the campus, including a recent operating room renovation in the McWane Building.

    CEP Construction

    Related Posts

    Upcoming Projects, July 2024

    July 17, 2024

    Upcoming Projects, June 2024

    June 19, 2024

    A Tech Guide to AI in Medical Construction

    June 18, 2024
    Industry Events
    • HealthSpaces 2025
      Jun 8, 2025 – Jun 10, 2025
    • NeoCon 2025
      Jun 9, 2025 – Jun 11, 2025
    • Guidelines for Laboratory Design – Health and Safety Considerations
      Jun 9, 2025 – Jun 13, 2025
    • 2025 FGIA Virtual Summer Summit
      Jun 17, 2025 – Jun 18, 2025
    • Building Decarbonization – Key Test and Balance Issues and Solutions for Occupancy, Wellness, and Sustainability
      Jun 18, 2025 – Jun 18, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!