Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Home»Construction & Delivery»Prefabricated Envelope, Utility Racks Add Speed & Safety for Delivery of New Hospital
    June 15, 2018

    Prefabricated Envelope, Utility Racks Add Speed & Safety for Delivery of New Hospital

    Share
    Facebook Twitter LinkedIn Email Copy Link

    IMC Construction recently broke ground on a new $100-million hospital in Quakertown, Pennsylvania for St. Luke’s University Health Network. The builder is using a fairly new process on the 131,000-square-foot project that will save time and construction costs.

    “We are prefabricating the exterior envelope between the patient room headwalls and the exterior brick,” explained Art Brinkworth, P.E., healthcare project director for IMC Construction. “The ceiling utilities will be installed in racks and fabricated in a warehouse offsite while we’re putting the steel, concrete and the roof on. That will save a lot of time.”

    IMC is working with Worth & Co. in the prefab process, and the panels will be constructed in its fabrication facility not far from the construction site.

    “Our people will be working in a controlled environment, and not up on ladders,” said Brinkworth. “Then the racks will just roll in and be positioned in the ceiling space. It’s much safer, efficient and will save time and money.”

    The new hospital is being constructed as a replacement hospital for the existing Quakertown Hospital, which is landlocked in its downtown location. The new building will include 40 private patient rooms, which can be expanded to an additional 40; 17 diagnostic radiology departments with CT scan, nuclear medicine, mammography and fluoroscopy machines; surgical and emergency departments and a laboratory, pharmacy and cafeteria. The cafeteria will feature a large, full-service kitchen. The existing hospital will be repurposed for doctor’s offices, outpatient care and behavioral health facilities.

    The St. Luke’s hospital team includes general contractor IMC Construction, architect MKSD Architects, structural engineer Pennoni, MEP HB Engineers, civil engineer Langan and medical equipment suppliers HBS.

    Construction Prefabrication

    Related Posts

    Healthcare Proposal Activity Slips, but Remains Resilient: PSMJ Survey

    May 14, 2025

    Healthcare Projects Recognized for Construction Excellence by Associated Builders and Contractors

    May 14, 2025

    Outpatient Revolution: Double-Digit Growth on Horizon, Says JLL

    May 14, 2025
    Industry Events
    • IAQA 2025 Annual Meeting & Expo
      Jun 1, 2025 – Jun 4, 2025
    • ACE Summit Session on Alignment in the Design Process
      Jun 2, 2025 – Jun 2, 2025
    • Energy Management 101 – The Building Blocks of an Effective Energy Management Program
      Jun 3, 2025 – Jun 3, 2025
    • Webinar: Design and Workflow Essentials for Instrument Processing Areas
      Jun 5, 2025 – Jun 5, 2025
    • Houston Summit – Future of Healthcare Facilities
      Jun 5, 2025 – Jun 5, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!