Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»eNewsletter»New Therapy Suite Serves Neuroblastoma Patients at Texas Children’s Hospital
    December 5, 2017

    New Therapy Suite Serves Neuroblastoma Patients at Texas Children’s Hospital

    Share
    Facebook Twitter LinkedIn Email Copy Link

    Texas Children’s Hospital in Houston has opened a new I-131 MIBG suite to treat children with high-risk neuroblastoma, a cancerous tumor that begins in the nerve tissue of infants and very young children. Metaiodobenzylguanidine is a compound that can be combined with radioactive iodine (I-131) to provide targeted radiation therapy. During the therapy, patients receive therapeutic doses of the radioactive iodine that attacks the tumors, but leaves patients radioactive for up to 10 days. The facility, which includes thick lead protection specified by the hospital’s physicist to provide radiation shielding, was designed by Dewberry.

    The suite enables parents to stay close to their child throughout the treatment, and consists of three rooms: a lead-lined patient room, an adjoining room with a lead-lined viewing window where family members can spend the night and an entry area where clinicians can consult and observe the patient.

    The suite was designed with radiation shielding elements including lead-lined floors, walls and ceilings with 3/8-inch lead bricks; lead-lined steel doors and the viewing window with five-inch thick lead glass. Installation of the lead-lined elements required careful structural evaluation. In addition, the air conditioning ductwork, medical gas and electrical piping systems were altered to accommodate the lead-lined protection.

    W. S. Bellows Construction Corporation served as general contractor on the project.

    Photos by Jud Haggard, courtesy of Dewberry.

    Construction MEP

    Related Posts

    Health First Unveils $230M Expansion Plans for Palm Bay Hospital in Florida

    June 2, 2025

    Robins & Morton, AdventHealth Celebrate Ribbon Cutting of $26 Million AdventHealth Meadow Pointe ER

    May 30, 2025

    Virtua Health Celebrates 75th Hospital Anniversary, Unveils $500M Renovation, Expansion Project in New Jersey

    May 29, 2025
    Industry Events
    • IAQA 2025 Annual Meeting & Expo
      Jun 1, 2025 – Jun 4, 2025
    • AIA Conference on Architecture 2025
      Jun 4, 2025 – Jun 7, 2025
    • Webinar: Design and Workflow Essentials for Instrument Processing Areas
      Jun 5, 2025 – Jun 5, 2025
    • Houston Summit – Future of Healthcare Facilities
      Jun 5, 2025 – Jun 5, 2025
    • HealthSpaces 2025
      Jun 8, 2025 – Jun 10, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!