Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Home»eNewsletter»Joint Replacement Center at Lawrence + Memorial Hospital Completed in 10 Months Utilizing Lean Concepts, IPD
    December 10, 2013

    Joint Replacement Center at Lawrence + Memorial Hospital Completed in 10 Months Utilizing Lean Concepts, IPD

    Share
    Facebook Twitter LinkedIn Email Copy Link

    After 10 months of construction, the new Certified Joint Replacement Center was completed at Lawrence + Memorial Hospital in New London, Conn. Moser Pilon Nelson Architects, along with AZ Corporation, delivered the project utilizing Lean concepts and Integrated Project Delivery led by the hospital. The $5.5-million project included complete renovation of the existing 12,000-square-foot unit along with a 4,500-square-foot addition onto an adjacent rooftop.

    The renovated and new rooms allow for greater accessibility for patients, including barrier-free showers and increased maneuverability at the bathroom fixtures, which was critical for patient and staff satisfaction. Family zone areas with built-in bench seating and enhanced lighting options make for a more pleasant visitor experience. Staff areas were reworked to reduce noise levels, reduce nursing steps and to provide decentralized work areas.

    The rooftop addition allowed for the number of private rooms to increase by 10 to bring the total to 22.

    Construction IPD Lean

    Related Posts

    Ribbon-Cutting Ceremony Held for Edwin Barbey Patient Care Pavilion at Cape Cod Hospital

    May 9, 2025

    Groundbreakings Held for Three Rehabilitation Hospitals in Florida

    May 5, 2025

    High-Tech Replacement Hospital in Georgia Tops Out

    April 30, 2025
    Industry Events
    • North Texas Summit – Future of Healthcare Facilities
      May 15, 2025 – May 15, 2025
    • 2025 ACOG Annual Clinical & Scientific Meeting
      May 16, 2025 – May 18, 2025
    • ACEC 2025 Annual Convention & Legislative Summit
      May 18, 2025 – May 21, 2025
    • Light for Life Virtual Security Symposium
      May 21, 2025 – May 21, 2025
    • Behavioral & Mental Health Workshop: Design for Health, Wellness, and Safety
      May 22, 2025 – May 22, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.

    Please support this website by adding us to your whitelist in your ad blocker. Ads are what helps us bring you premium content! Thank you!