Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»eNewsletter»Proposed Systems Manual Guideline Open for Public Review
    May 13, 2013

    Proposed Systems Manual Guideline Open for Public Review

    Share
    Facebook Twitter LinkedIn Email Copy Link

    ATLANTA, Ga. -– A proposed guideline that will establish a uniform procedure for transmitting design, construction, testing and operational information to building owners and operators is open for public comment.

    Guideline 1.4P, The Systems Manual for Facilities, provides procedures for producing a systems manual as a resource for training, operations, maintenance and upgrading of facilities. The guideline applies to information from planning, commissioning process, design, construction, testing and training activities and operations planning for new, renovated and existing facilities, equipment and assemblies.    

    The proposed guideline is open for an advisory public review until June 2, 2013. To read the draft guideline or to submit comments, visit www.ashrae.org/publicreviews.

    ASHRAE Standard 202P, Commissioning Process for Buildings and Systems and other ASHRAE guidelines on commissioning require development of a systems manual, as do several other standards and energy- and sustainability-related codes. However, no document or guideline outlines how to assemble a systems manual to current requirements.  Guideline 1.4P provides these procedures, according to Gerald Kettler, chair of the Guideline 1.4P committee.

    “Establishing a uniform procedure for transmitting the design, construction, testing and operational information to building owners and operators is critical to the proper and efficient operation of facilities,” Kettler said. “Guideline 1.4P provides the structure and procedures for the transfer and maintenance of that information. It also is intended for use as operator and occupant training information.”

    Other commissioning guidance from ASHRAE includes Guideline 0-2005, The Commissioning Process; Guideline 1.1-2007, HVAC&R Technical Requirements for the Commissioning Process and Guideline 1.5-2012, The Commissioning Process for Smoke Control Systems.

    ASHRAE also is working on several other guidelines and a standard related to commissioning:  Guideline 0.2P, The Commissioning Process for Existing Systems and Assemblies; Guideline 1.2P, The Commissioning Process for Existing HVAC&R Systems; Guideline 1.3P, Building Operation and Maintenance Training for the HVAC&R Commissioning Process and Standard 202P.
     

    Related Posts

    Zurn Introduces Ligature-Resistant Floor Drains

    October 23, 2025

    CU Anschutz Receives $50M Gift to Transform Mental Health Care

    October 23, 2025

    EmPATH Unit Opens at MUSC Shawn Jenkins Children’s Hospital

    October 22, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.