Close Menu
Medical Construction and Design
    Facebook X (Twitter) Instagram
    X (Twitter) LinkedIn
    Medical Construction and Design
    • Home
    • Advertise/Media Kit
    • Subscribe FREE
    • eNews
    • Events Calendar
    • View Issues
    • Webinars/White Paper
      • MCD Webinars
      • White Papers
    • Contact Us
      • MCD Staff
      • Submit News
    Medical Construction and Design
    Medical Construction and Design
    Home»eNewsletter»Bureau of Labor Statistics Introduces Index for New Health Care Building Construction
    April 15, 2013

    Bureau of Labor Statistics Introduces Index for New Health Care Building Construction

    Share
    Facebook Twitter LinkedIn Email Copy Link

    With the release of data for January 2013, the Bureau of Labor Statistics has expanded the Producer Price Index by introducing an index measuring the changes in output prices for New Health Care Building construction. This index is classified under a PPI-specific 2012 North American Industry Classification System code, 236224. This index appears in table 5 of the PPI Detailed Report, and also is available online through the BLS website under PPI Industry Data. January 2013 is the first month of data released for this index.

    The index for NAICS 236224, New Health Care Building Construction, is the latest measure developed and published by PPI as part of its Nonresidential Building Construction initiative. The latest measure is in addition to: NAICS 236221, New Warehouse Building Construction; NAICS 236222, New School Building Construction; NAICS 236223, New Office Building Construction; and NAICS 236211, New Industrial Building Construction. Indexes created under the NRBC initiative yield a national weighted-average estimate of output price changes.

    A healthcare building is defined as a structure used primarily for healthcare-related activities. Included in this definition are hospitals, mental hospitals, infirmaries, hospital infrastructure (buildings for radiology, CT/MRI, radiation therapy, etc.), medical clinics, medical offices, medical labs, doctor and dentist offices, outpatient clinics, research labs (non-manufacturing, non-educational, or non-hospital), nursing homes, hospices, orphan homes, sanatoriums, drug clinics, rehabilitation centers, rest homes and adult day-care centers.

    BLS uses a method in which healthcare building models are selected from healthcare buildings constructed in the United States over a specified time period. These models represent the typical healthcare buildings being constructed in each of the four major census regions (Northeast, South, Midwest and West). Multiple healthcare models were developed to accommodate regional variations in building design. The building models are described as a series of unique production elements or “assemblies” in BLS terminology. Each building assembly represents a building construction activity that can be fully defined as a unique portion of the total project. Each assembly is made up of unit-price components that define the specific type and quantity of materials, labor and equipment necessary for the assembly’s installation.

    A professional cost-estimating firm developed the building models under BLS direction. To achieve an output price, BLS combines the detailed material and installation (labor and related equipment) cost data, which are updated quarterly by the cost-estimating firm, with margin (overhead and profit) data collected monthly by BLS directly from building construction contractors. BLS aggregates output price changes captured at the assembly level each month to represent the changes in output prices for the total structure. Therefore, the BLS output indexes attempt to measure changes in the input costs for these structures, along with changes in contractor markups.

    For more information, visit http://www.bls.gov/ppi/data.htm.

    Related Posts

    Zurn Introduces Ligature-Resistant Floor Drains

    October 23, 2025

    CU Anschutz Receives $50M Gift to Transform Mental Health Care

    October 23, 2025

    EmPATH Unit Opens at MUSC Shawn Jenkins Children’s Hospital

    October 22, 2025

    News

    • Industry News
    • Projects
    • People News
    • eNewsletter
    • Webinars
    • White Papers

    Magazine

    • Advertising
    • Subscriptions
    • Media Kit
    • Contact Us
    • Submit News
    • View Issues

    © Inform Publishing Group, LLC. All rights reserved.

    Privacy Policy

    Sign Up for MCD eNews
    .
    X (Twitter) LinkedIn

    Type above and press Enter to search. Press Esc to cancel.